Consultation is solicited on the implementation plan of subsidy for LNG power Transformation of ships in green development demonstration project of Inland Waterway Shipping in Zhongshan

2022-04-28 0 By

On February 9, the reporter learned from the Municipal Bureau of Transport that the Implementation Plan of LNG Power Renovation Subsidy for ships of the Green Development Demonstration Project of Inland River Shipping in Zhongshan city (draft for Consultation) is now soliciting public opinions.It is reported that the provincial-level single ship subsidy can be up to 3.8 million YUAN, according to the provincial-level single ship subsidy amount, the city finance in accordance with the highest 1:1 ratio of supporting subsidies.According to the Draft for Consultation, the subsidy funds are mainly used for the transformation of existing or under construction inland river transport ships in Zhongshan into LNG-powered ships, as well as the necessary work expenses for the implementation of the lnG-powered transformation project of inland river ships in Zhongshan.The subsidy is applicable to the owners of existing or under-construction inland waterway transport vessels that are converted to LNG-powered vessels, as well as the third party units that provide relevant technologies.The subsidy scope is for ships that have been renovated in shipyards in Guangdong province from July 1, 2021 to December 31, 2022 and have passed the inspection and obtained the inspection certificate.According to the Draft, existing ships are required to apply for LNG power renovation subsidies and be registered in Zhongshan.The vessel shall be an inland river general cargo ship, aged less than 15 years (built on or after 1 July 2006), with a tonnage of not less than 400 gross tons.To apply for LNG power transformation subsidy for ships under construction, the type of ships should be inland river general cargo ships with a tonnage of no less than 400 gross tons;After the transformation of the ship registered in Zhongshan city, and promised not to leave zhongshan city for five years.It is worth noting that the total amount of ship renovation subsidies is controlled. For the ships included in the ship renovation subsidy project database of the Provincial Department of Transport, the total amount of municipal subsidies is 7.Declaration: The copyright of this article belongs to the original author, if there is a source error or infringement of your legitimate rights and interests, you can contact us through the mailbox, we will promptly deal with.Email address: jpbl@jp.jiupainews.com